色狠狠久久av北条麻妃,久久99精品久久久久久久久久,xxxwww日本,亚洲日韩AV一区二区三区四区

歡迎進入山東恒能環(huán)保能源設備有限公司

熱線電話

0531-69953988

分類導航
產品展示
聯(lián)系我們
山東恒能環(huán)保能源設備有限公司

聯(lián)系電話:18678860671

服務熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿易試驗區(qū)濟南片區(qū)孫村街道經十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

生物脫硫設備冷卻塔的安裝

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.
以上就是為大家介紹的有關生物脫硫的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務http://
The above is a detailed introduction of biological desulfurization for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://

相關產品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
无码人妻精品中文字幕免费| 黄色色网站| 日韩精品免费一区二区三区竹菊| 无码少妇丰满熟妇一区二区| 亚洲AV无码无在线观看| 久久综合88| 久久久久国产精品一区三寸| 91丨porny丨丰满熟女| 色伊伊| 一本久道久久合久久鬼色8| 黄色三级三级三级三级三级| 肥乡县| 欧美猛少妇色XXXXX猛叫| 日韩精品人妻无码久久影院| 国内精品久久久久久99蜜桃| 97AV麻豆蜜桃一区二区| 亚洲AV鲁丝一区二区三区| 久久亚洲国产中文香蕉视频| 日本午夜免费福利视频| 无翼乌工口肉肉无遮挡无码18| 最清晰的女厕偷拍77777| 97香蕉碰碰人妻国产欧美| 日韩在线你懂的| 亚洲乱码国产乱码精品精| 91精品久久日日躁夜夜躁欧美| 久久精品国产96精品亚洲| 国产福利无码一区在线| 99久久精品国产一区二区蜜芽| 亚洲欧美日韩国产精品一区二区| 亚洲Av无码国产精品色午夜字幕| 久久久久久成人毛片免费看| 99视频在线观看精品29| 2021年国产中文字无码专区| 精品卡一卡二卡乱码高清| 日韩黄片在线播放| 9人人澡人人爽人人精品| 免费无挡无摭十八禁视频在线观看 | 日韩精品无码二区| 日韩精品极品视频在线观看免费| 国产av麻豆美艳房东mad026| 欧美精品亚洲精品日韩精品|