色狠狠久久av北条麻妃,久久99精品久久久久久久久久,xxxwww日本,亚洲日韩AV一区二区三区四区

歡迎進入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運行維護!

沼氣凈化裝置的運行維護應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時,應(yīng)每天排除冷凝水,排水時應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時,應(yīng)及時補充循環(huán)營養(yǎng)液。塔內(nèi)填料應(yīng)6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達不到設(shè)計要求時應(yīng)更換脫硫劑或進行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時,應(yīng)關(guān)閉沼氣進出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時,應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進行2次~3次再生后應(yīng)及時更換,更換脫硫劑時操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃氣體凈化及利用行業(yè)
中国熟妇xxx| 国产精品偷窥熟女精品视频| 欧美极品另类ⅴideosde| 最近免费高清版电影在线观看| 337P日本欧洲亚洲大胆艺术图| 亚洲av日韩av无码| 国产精品s色| 久久精品人人做人人爽电影蜜桃| 天天有喜| 久久精品无码日韩国产| 久久精品国产99国产精品| 久久毛片免费看一区二区三区| 97资源共享在线视频| 色狠狠一区二区三区香蕉| 天天有喜| 91精品久久| 黑人最大最粗bbbbvb| 一本色道久久88加勒比| 青草青草视频2免费观看| 狠狠狠狼鲁欧美综合网| 国产XXXX色视频在线观看 | www插插插无码免费视频网站| 国产精品无卡毛片视频| 久久国产精品无码网站| 久久99精品久久久久久野外| 亚洲AV成人噜噜无码网站| 亚洲人成人无码网WWW国产| 精品无码一区二区三区爱欲| 97精品亚成在人线免视频| 91九色国产| 人人爽人人爽人人| 黑人一级| .女教师第一次| 无码精品视频一区二区三区蜜臀视频| 丝袜一区二区三区在线播放| 亚洲成H人AV无码动漫无遮挡| 亚洲国产精品成人久久久| 成人欧美日韩一区二区三区| 极品粉嫩嫩模大尺度无码| 亚洲综合日韩久久成人AV| 欧美精品亚洲精品日韩已满十八|